[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [interesting-people Home]
Subject: IP: Re: computer and telecom centers get undeserved black eye for power usage
>Date: Mon, 09 Apr 2001 07:24:04 -0700 >To: farber@cis.upenn.edu, ip-sub-1@majordomo.pobox.com >From: "Joseph C. Pistritto" <jcp@jcphome.com> >Subject: Re: IP: computer and telecom centers get undeserved black eye > for power usage > >I just got done ordering our data center setup at Zaplet Inc. where I used >to work. The datacenter is at Equinix. > >We provisioned it at 2 20amp 120V circuits per rack (42U units of >equipment). That's not enough for 42U of "1U" servers, but then you have >a huge cooling problem as well if you dump that much power into that small >a space. The reason we used 2 20amp circuits was for redundency, but i >can see someone actually *using* that much power if they really fill up >the rack space (in which case you'd need to provision additional circuits >but not additional current draw for redundency). > >So assuming 20amps @ 120v = approx 2.5KW per "rack" and lets say it takes >*another* 2.5KW to air condition that space (which is overkill, air >conditioning is more efficient than resistive heating, which is >essentially what computers are...), that means approximately a 4 sq. foot >area would have 5KW of draw. (not including corridors and such). Or >2.5KW per square foot (high estimate). > >So that works out to: > 1.25KW per sq. foot (high estimate for densely packed areas) > >We know this is high because people usually quote "available power" in the >200-300 watts/sq. foot range (inclusive of hallways etc.). 275watts/sq. >ft. is a common metric used here for power availability for >instance. (your lesser dataccenters dont even have that much >available). (thats direct power draw, not including airconditioning, so >doubling that would be approximately 0.5 KW/sq. ft. So we can tell my >estimate above from our racks is high, but irrationally so for actual >worst case). > >It seems reasonable that a datacenter (aka "server farm") would ask for 10 >megawatts of power though. (so 46 of them could well have asked for 500 >Megawatts). I know that *ONE* 2 million sq. ft planned facility in San >Jose is speced at 190Megawatts (the city council is forcing them to put in >a cogen plant with that capacity before building it though...) > >I think the 60-100KW/sq. ft. is an arithmetic error though. > > -jcp- For archives see: http://www.interesting-people.org/
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [interesting-people Home]
Powered by eList eXpress LLC